Description
Facilitates access control in secure areas indoors. Typical usage includes passenger traffic ticket and access control points, airports/seaports, authorized personnel entry points, passenger flow direction, access control points in secure buildings (e.g. federal facilities, including border crossings, departments, other agencies and branches, ticket control and fee collection points, stadiums, multi-purpose arenas, access control, and TNT systems in the workplace, e.g. offices, special areas in factories. Priced per module (Master/Primary Cabinet, Secondary/Slave Cabinet, and Center/Hybrid variations). Low or High glass panels are available with Standard or Wide lanes. The standard finish features Stainless Steel and Clear tempered glass. More color choices are also available.
GT Series Documentation:
- Data Sheet – GT1-170 / GT2-170 – High Glass Optical Speed Gates
- Data Sheet – GT1-100 / GT2-100 Low Glass Optical Speed Gates
- Data Sheet – GT3-100 / GT3-170
STANDARD FEATURES
- Ideal for indoor use in prestige settings
- Sliding Glass Optical Turnstile Speed Gate
- 304 Stainless Steel frame with Clear Glass side panels
- Clear tempered glass
- Lane Width: Standard 20.8″, Wide 30.1″, or Extra Wide 35.4″
- Glass Height:
- 170 – High Glass (1700mm)
- 100 – Low Glass (1000mm)
OPTIONS
- Color powder coating for cabinets and color glazing for gates
- Integrate with EntraPASS Access Control System, Ticketing, Time and Attendance, Visitor System
- Readers appointed by customers, card PIN Password Barcode Scanner or Biometric Reader
- Integrate with face recognition system, fingerprint identification system, ID card recognition system, or passport identification system
FINISH
DRAWINGS & DIMENSIONS
Click to enlarge
VIDEO
INSTALLATION
Installation Services Available.
See our portfolio of work here
** Please note, the listed price is for goods only. Shipping charges are separate.
***Shipping charges to be determined at the time of shipment. Lead times required for manufacturing.
Terms & Conditions
50% deposit is due at the time of order (to begin manufacturing) and the remaining balance is due at the time of shipping.