Our client had us modify their entryway using a set of our sliding glass barrier Optical Turnstiles.
We are allowed to share photos of these projects but the client does not want their name used.
You can see the process of our work in the photos here.
Optical Turnstile Entrance Installation Locations:
L1 – ACD Dallas TX
L2 – CBD Dallas TX
L3 – Clark NJ
L4 – McCalla AL
L5 – Monmouth Junction NJ
L6 – Manchester PA
— Remove your existing tile flooring and dispose
— Place your Turnstiles in the location as signed
— Trench the flooring and place conduit in the trench for your Electrician and Low Voltage Contractors
— Wire the cabinet controllers from the Main Cabinet to the Slave Cabinet
— Replace the tile flooring with tile provided by client
— Build a partition wall at the Turnstiles with aluminum fencing
— Measure for glass and provide glass dimensions
— Relocate your existing aluminum, glass and door
— Build new walls, frame, drywall, mud, tape, and paint
— Install new carpet tiles provided by client
— Test the system to show operability